60007 Sir Nigel Gresley
Moderators: 52D, Tom F, Rlangham, Atlantic 3279, Blink Bonny, Saint Johnstoun, richard
60007 Sir Nigel Gresley
Apparently it has just passed its boiler hydraulic exam.
So its on its way back to steam.
So its on its way back to steam.
- 60800
- LNER A4 4-6-2 'Streak'
- Posts: 2316
- Joined: Sun Apr 17, 2011 5:41 pm
- Location: N-Lincolnshire
- Contact:
Re: 60007 Sir Nigel Gresley
I'm confused as to why 60007 needed a boiler hydraulic exam. As far as I understood it on my last visit (in October 2011), the problem was with the cheap chinese copper used to repair the firebox and the boiler was fine.
36C - Based out of 50H and 36F
- Blink Bonny
- LNER A4 4-6-2 'Streak'
- Posts: 3946
- Joined: Mon Dec 03, 2007 9:21 pm
- Location: The Midlands
- Contact:
Re: 60007 Sir Nigel Gresley
Ay up!
Blackout, the boiler and firebox are regarded as one unit for inspection and insurance purposes. Hence the need for a boiler inspection after firebox surgery.
Believe me, you don't want to be anywhere near a firebox that springs a leak under pressure. And the firebox is the "weak link" in the boiler.
Blackout, the boiler and firebox are regarded as one unit for inspection and insurance purposes. Hence the need for a boiler inspection after firebox surgery.
Believe me, you don't want to be anywhere near a firebox that springs a leak under pressure. And the firebox is the "weak link" in the boiler.
If I ain't here, I'm in Bilston, scoffing decent chips at last!!!!
-
- LNER A4 4-6-2 'Streak'
- Posts: 4306
- Joined: Wed Oct 25, 2006 8:46 am
Re: 60007 Sir Nigel Gresley
Yes, I saw Roger Barker in the newsagent on Wednesday teatime and he was very pleased about it.
- 60800
- LNER A4 4-6-2 'Streak'
- Posts: 2316
- Joined: Sun Apr 17, 2011 5:41 pm
- Location: N-Lincolnshire
- Contact:
Re: 60007 Sir Nigel Gresley
One more small query, are the boiler and firebox still in the frames, or have they been removed for the tests?
36C - Based out of 50H and 36F
-
- LNER A4 4-6-2 'Streak'
- Posts: 4306
- Joined: Wed Oct 25, 2006 8:46 am
Re: 60007 Sir Nigel Gresley
They'd have been removed for the work and wouldn't be put back until tested. I did ask Roger if he'd put it back - after all, he'd had all afternoon - but he said (I think) March.
Re: 60007 Sir Nigel Gresley
The boiler/firebox hasn't been out of the frames. The work was done with it in situ.
-
- LNER A4 4-6-2 'Streak'
- Posts: 4306
- Joined: Wed Oct 25, 2006 8:46 am
Re: 60007 Sir Nigel Gresley
Was the work inside the firebox, then?
- 60800
- LNER A4 4-6-2 'Streak'
- Posts: 2316
- Joined: Sun Apr 17, 2011 5:41 pm
- Location: N-Lincolnshire
- Contact:
Re: 60007 Sir Nigel Gresley
I presume so, as when I saw her back in October, everything in the cab was gone and a few panels (access hatches etc) had been removed from the streamlined casing too.
36C - Based out of 50H and 36F