LNER dock shunter, steam railcars, Sentinel, Met-Camm

This forum is for the discussion of the locomotives, motive power, and rolling stock of the LNER and its constituent companies.

Moderators: 52D, Tom F, Rlangham, Atlantic 3279, Blink Bonny, Saint Johnstoun, richard

Eightpot
NBR J36 0-6-0
Posts: 124
Joined: Sat Oct 25, 2008 1:29 pm

Re: The GNR didn't design a dock shunter, so neither did the LNER

Post by Eightpot »

john coffin wrote: Wed May 11, 2022 1:20 pm
The interesting thing is that although there were a lot of different Sentinels on the LNER, no drawings
appear to have survived, except a couple of magazine ones which of course we now question the accuracy of.

Paul
As Drawings Officer of the Sentinel Drivers Club I can advise that we do have General Arrangement drawings for the Y1, Y3, and (without checking) probably for the Y10 as well. Drawings cost £5 each to SDC members and £15 each to non-members. They are normally sent via email against payment.
Danby Wiske
GCR D11 4-4-0 'Improved Director'
Posts: 413
Joined: Fri Oct 19, 2012 12:09 am

Re: The GNR didn't design a dock shunter, so neither did the LNER

Post by Danby Wiske »

Many thanks! I wasn't aware of this organisation, but I've just enjoyed exploring your website. A great resource!
Eightpot
NBR J36 0-6-0
Posts: 124
Joined: Sat Oct 25, 2008 1:29 pm

Re: The GNR didn't design a dock shunter, so neither did the LNER

Post by Eightpot »

Further to my original posting I can confirm that the SDC does have General Arrangement drawings for the LNER Sentinel locos. Starting with the drawing number.......

L927 (a London Office drawing) Y1 8400/BR 68130/Departmental 37, the first LNER Sentinel with the early type cab and bunker with 2' - 8-1/2" diameter boiler.

8382 Y1/1 with later cab and bunker arrangement, but still with 2' - 8-1/2" diameter boiler and single funnel/chimney as had L927 too.

11070 Generally for the remainder of the Y1 class, now fitted with the 3' - 1" diameter 25%LTS (Larger Than Standard) boiler and a double funnel/chimney.

12450 Generally covering the Y3, built with the 25%LTS boiler and double funnel/chimney.

12015 Y10 double cab-ended 200 hp locos 8147 & 8148, BR 68186 & 68187.

While writing, as far as the Railcars are concerned Sentinel only supplied the boilers, engines and other mechanical parts including the power bogies. All the bodywork, frames etc. were done by Metropolitan-Cammell.
john coffin
LNER V2 2-6-2 'Green Arrow'
Posts: 1100
Joined: Mon Sep 19, 2011 12:24 am

Re: The GNR didn't design a dock shunter, so neither did the LNER

Post by john coffin »

Thanks Eightpot,
It is interesting that all the previously published stuff refers to them as Sentinel railcars, and makes little mention
of Metro Cammell's involvement.

I guess it is therefore possible that some data may be available at the Metro Cam archive?

Paul
Hatfield Shed
LNER A4 4-6-2 'Streak'
Posts: 1728
Joined: Fri Dec 23, 2011 3:34 pm

Re: LNER dock shunter, steam railcars, Sentinel, Met-Camm

Post by Hatfield Shed »

I have altered the title to better represent the interesting steam railcar content
Danby Wiske
GCR D11 4-4-0 'Improved Director'
Posts: 413
Joined: Fri Oct 19, 2012 12:09 am

Re: The GNR didn't design a dock shunter, so neither did the LNER

Post by Danby Wiske »

65447 wrote: Tue May 10, 2022 5:17 pm Not sure that the Sentinel shunters were single-manned...
Sorry to drag this up again, but I've stumbled across evidence of a regular single-manned turn. In some reminiscences published in NERA Express No 179 (August 2005), former Starbeck fireman Gerry M Pierson stated that
The Ripon Pilot was normally provided by Sentinel shunter No 192. When this was so, no fireman was required, and he worked the early and late Harrogate pilot turns.
(The italics are mine.)

This is confirmed in a later article in Express No 184 (November 2006) by Stephen Askew, based on an original "Drivers' and Firemen's Timebook" from Starbeck shed, dating from Spring 1937. (Mr Pierson assisted with the preparation of this article, but sadly passed away before it was published.)

Mr Askew writes:
The Starbeck No 3 Pilot worked in Harrogate goods yard and had two regular drivers working early and late on alternate weeks. The drivers did not have regular firemen but were paired with firemen from the Heavy Goods Link who were spare due to their own drivers working the single-manned Class Y3 on the Ripon Pilot.
(The Harrogate Pilot was usually J25 No 1743.)

Rather interestingly, this article is illustrated with a picture of No 192 at Ripon in 1934, showing two men on the footplate! Maybe it was taken at the changeover between early and late turns, or perhaps one of them is a shunter keeping warm between duties. (Conjecture, I know, but at least the Timebook provides hard evidence that the Sentinels were single-manned, at least at Ripon.)
65447
LNER A4 4-6-2 'Streak'
Posts: 1775
Joined: Fri Oct 19, 2007 2:44 pm
Location: Overlooking the GEML

Re: The GNR didn't design a dock shunter, so neither did the LNER

Post by 65447 »

Danby Wiske wrote: Sun Feb 26, 2023 11:02 pm
65447 wrote: Tue May 10, 2022 5:17 pm Not sure that the Sentinel shunters were single-manned...
Sorry to drag this up again, but I've stumbled across evidence of a regular single-manned turn. In some reminiscences published in NERA Express No 179 (August 2005), former Starbeck fireman Gerry M Pierson stated that
The Ripon Pilot was normally provided by Sentinel shunter No 192. When this was so, no fireman was required, and he worked the early and late Harrogate pilot turns.
(The italics are mine.)

This is confirmed in a later article in Express No 184 (November 2006) by Stephen Askew, based on an original "Drivers' and Firemen's Timebook" from Starbeck shed, dating from Spring 1937. (Mr Pierson assisted with the preparation of this article, but sadly passed away before it was published.)

Mr Askew writes:
The Starbeck No 3 Pilot worked in Harrogate goods yard and had two regular drivers working early and late on alternate weeks. The drivers did not have regular firemen but were paired with firemen from the Heavy Goods Link who were spare due to their own drivers working the single-manned Class Y3 on the Ripon Pilot.
(The Harrogate Pilot was usually J25 No 1743.)

Rather interestingly, this article is illustrated with a picture of No 192 at Ripon in 1934, showing two men on the footplate! Maybe it was taken at the changeover between early and late turns, or perhaps one of them is a shunter keeping warm between duties. (Conjecture, I know, but at least the Timebook provides hard evidence that the Sentinels were single-manned, at least at Ripon.)
All that does is confirm that one or more specific turns were single manned, while confirming that others (e.g. Harrogate Goods Yard) were not.
Danby Wiske
GCR D11 4-4-0 'Improved Director'
Posts: 413
Joined: Fri Oct 19, 2012 12:09 am

Re: The GNR didn't design a dock shunter, so neither did the LNER

Post by Danby Wiske »

65447 wrote: Tue Feb 28, 2023 6:18 pm All that does is confirm that one or more specific turns were single manned,
My point exactly.
while confirming that others (e.g. Harrogate Goods Yard) were not.
How could it be? It was a J25, as stated above.
Post Reply