working on the chain gang

This forum is for the discussion of all railway subjects that do not include the LNER, and its constituent companies.

Moderators: 52D, Tom F, Rlangham, Atlantic 3279, Blink Bonny, Saint Johnstoun, richard

User avatar
Mr Bunt
NBR D34 4-4-0 'Glen'
Posts: 275
Joined: Sun Feb 14, 2010 4:11 am
Location: 30B

working on the chain gang

Post by Mr Bunt »

What are these "yards" things? In my day if it wasn't miles it was chains.

Footbridge at Cheshunt earlier today.
Attachments
IMG-20130204-00032.jpg
User avatar
StevieG
LNER A4 4-6-2 'Streak'
Posts: 2353
Joined: Sat Oct 10, 2009 9:08 pm
Location: Near the GN main line in N.Herts.

Re: working on the chain gang

Post by StevieG »

Mr Bunt wrote:What are these "yards" things? In my day if it wasn't miles it was chains.

Footbridge at Cheshunt earlier today.
And I'd say it still ought to be in Chains ( - officially; however archaic that may appear: Well I'm pretty sure it would've been chains up to last year at least, anyway).
BZOH

/
\ \ \ //\ \
/// \ \ \ \
User avatar
Mr Bunt
NBR D34 4-4-0 'Glen'
Posts: 275
Joined: Sun Feb 14, 2010 4:11 am
Location: 30B

Re: working on the chain gang

Post by Mr Bunt »

StevieG wrote:
Mr Bunt wrote:What are these "yards" things? In my day if it wasn't miles it was chains.

Footbridge at Cheshunt earlier today.
And I'd say it still ought to be in Chains ( - officially; however archaic that may appear: Well I'm pretty sure it would've been chains up to last year at least, anyway).
Don't know when this plate went up, but grateful it isn't metric :-D
User avatar
R. pike
GNR C1 4-4-2
Posts: 765
Joined: Mon Oct 01, 2007 1:21 pm
Location: just off the GN mainline
Contact:

Re: working on the chain gang

Post by R. pike »

This bridge was put up over Christmas and is marked in miles chains...
DSC02596a.jpg
User avatar
StevieG
LNER A4 4-6-2 'Streak'
Posts: 2353
Joined: Sat Oct 10, 2009 9:08 pm
Location: Near the GN main line in N.Herts.

Re: working on the chain gang

Post by StevieG »

R. pike wrote:This bridge was put up over Christmas and is marked in miles chains...
DSC02596a.jpg
Presume it's the first one to be put up between 107 and 108 (i.e., suffix 'A'), but wonder what the 'D's for?
BZOH

/
\ \ \ //\ \
/// \ \ \ \
User avatar
R. pike
GNR C1 4-4-2
Posts: 765
Joined: Mon Oct 01, 2007 1:21 pm
Location: just off the GN mainline
Contact:

Re: working on the chain gang

Post by R. pike »

StevieG wrote:
R. pike wrote:This bridge was put up over Christmas and is marked in miles chains...
DSC02596a.jpg
Presume it's the first one to be put up between 107 and 108 (i.e., suffix 'A'), but wonder what the 'D's for?
There is already a 107D i believe.. I've not really worked it out yet.
User avatar
52D
LNER A4 4-6-2 'Streak'
Posts: 3968
Joined: Sun Jun 03, 2007 3:50 pm
Location: Reallocated now between the Lickey and GWR
Contact:

Re: working on the chain gang

Post by 52D »

Doncaster or Darlington area?
Hi interested in the area served by 52D. also researching colliery wagonways from same area.
User avatar
R. pike
GNR C1 4-4-2
Posts: 765
Joined: Mon Oct 01, 2007 1:21 pm
Location: just off the GN mainline
Contact:

Re: working on the chain gang

Post by R. pike »

52D wrote:Doncaster or Darlington area?
Arlesey.
User avatar
manna
LNER A4 4-6-2 'Streak'
Posts: 3863
Joined: Sun May 24, 2009 12:56 am
Location: All over Australia

Re: working on the chain gang

Post by manna »

G'Day Gents

Bang goes that bit of logic :twisted:

manna
EDGWARE GN, Steam in the Suburbs.
User avatar
60041
GCR O4 2-8-0 'ROD'
Posts: 559
Joined: Mon Jun 25, 2007 8:36 pm
Location: 20 feet from the ECML, 52D, Northumberland

Re: working on the chain gang

Post by 60041 »

We live in a former railway property next to the ECML. I have had recent communications from Network Rail concerning drainage and fencing, and all their paperwork refers to miles and chains. Quite handy really as there is the 31 3/4 mile post at the end of the garden so it is easy to work out the distance along the boundary from that, if the paperwork was in Km and metres I would be totally lost.
User avatar
StevieG
LNER A4 4-6-2 'Streak'
Posts: 2353
Joined: Sat Oct 10, 2009 9:08 pm
Location: Near the GN main line in N.Herts.

Re: working on the chain gang

Post by StevieG »

manna wrote:G'Day Gents

Bang goes that bit of logic :twisted:

manna
Not necessarily.
Darlington area, and quite possibly Doncaster area if north of Shaftholme, as ex-NER territory, could easily have a different number series for ECML bridges.
The ELR (Engineer's Line References) codes for long routes are often sub-divided these days); e.g. ECM1, ECM2, etc., as seen in the photo in RP's post of yesterday (not sure how long this practice has been in place).
BZOH

/
\ \ \ //\ \
/// \ \ \ \
52A
LNER V2 2-6-2 'Green Arrow'
Posts: 1107
Joined: Sun Apr 30, 2006 10:50 am

Re: working on the chain gang

Post by 52A »

ECML mileages count from zero at KX to York. Then from zero at York to Newcastle, zero from Newcastle to the border and from zero at Edinburgh to the border.
Bryan
LNER A4 4-6-2 'Streak'
Posts: 2224
Joined: Sat Jan 06, 2007 6:48 pm
Location: York

Re: working on the chain gang

Post by Bryan »

ELRs came into general use in the late 80s prior to that a numeric route code had been tried.
Can be easily found in Quail maps.

Most ELRs are fairly easy to work out.
Generally an initial for a junction or station at each end.
YMS - York - Malton - Scarborough.
HBS - Hull - Bridlington - Seamer
TJC3 - Tapton Jcn - Colne from Normanton through Leeds West to Skipton North.
The number is in place when the route has been subdivided as stated earlier like ECM 1,2,3,4,5,

As for how long the practice of including the code on bridge plates.
I seem to remember seeing my first one in the mid 90s on Leeds North West electrification works.

As for the use of chainages this is definately because all structure records are recorded in Miles, Chains and yards. I think Links have finally disappeared though.
Unless that is the structure is an Overhead Power mast then it is located in KMs.
User avatar
StevieG
LNER A4 4-6-2 'Streak'
Posts: 2353
Joined: Sat Oct 10, 2009 9:08 pm
Location: Near the GN main line in N.Herts.

Re: working on the chain gang

Post by StevieG »

52A wrote:ECML mileages count from zero at KX to York. Then from zero at York to Newcastle, zero from Newcastle to the border and from zero at Edinburgh to the border.
Agreed, 52A. But do the bridge number series start at the same zero mileposts I wonder. I don't know.
Oh for access to GEOGIS; - Sorry, CARRS!
Bryan wrote: " ELRs came into general use in the late 80s prior to that a numeric route code had been tried.
Can be easily found in Quail maps. .... "
There is also an alpha-numeric system in internal use called 'Line Of Route' (LOR) principally for non-engineering purposes I'd think, and is found in such as Sectional Appendix Table 'A' line diagram page headings and Weekly Operating Notice route sections; e.g. LN101 (the modern NR 'LNE' Route), and EA1310 ('East Anglia' Route).
Is that anything to do with the numeric code you refer to? Or is it the method used in the 1947 LNER Sectional Appendices?
Bryan wrote: " .... Unless that is the structure is an Overhead Power mast then it is located in KMs. "
... for the ECML electrification (including the earlier GN Suburban elec'n), and presumably other relatively modern schemes, yes.
But to be fair this isn't always so everywhere. For example the London - Liverpool/Manchester sections at least of the WCML elec'n, I'd have thought would be numbered imperially, and the early GE overhead structures (e.g. Liverpool Street - Southend Vic., are definitely No.'d in Miles / nnth structure in the mile.
BZOH

/
\ \ \ //\ \
/// \ \ \ \
cambois
GNSR D40 4-4-0
Posts: 204
Joined: Fri Jul 16, 2010 10:04 pm
Location: Dunblane

Re: working on the chain gang

Post by cambois »

Is the bridge the new Hitchin flyover and the D refers to one of the at least 4 spans?
Post Reply