I believe there has been a slight altercation between 2 HST sets on depot resulting in a number of Mk 3 coaches requiring lifting and rerailing.
I also understand 2 Breakdown cranes are on route from Margam and Wigan.
No road access available so proper rail cranes in use for a change.
I think lifting takes place from tomorrow Wed 18th.
Anyone know any more?
Neville Hill Depot
Moderators: 52D, Tom F, Rlangham, Atlantic 3279, Blink Bonny, Saint Johnstoun, richard
-
- LNER J39 0-6-0
- Posts: 161
- Joined: Sun Nov 30, 2008 4:41 pm
- Location: Swindon but Born & Bred Geordie
Re: Neville Hill Depot
It appears that one of the empty sets went past a Stop board without permission. Here's the result.
Keith
Keith
Keep The Faith
http://www.keithstransportpics.co.uk
http://www.keithstransportpics.co.uk
-
- NER C7 4-4-2
- Posts: 832
- Joined: Sun Jan 25, 2009 1:39 pm
- Location: Ferrybridge,West Yorkshire