NXEA Mk3's
Posted: Mon Aug 17, 2009 10:26 pm
The mark 3 hauled coaching stock on the Norwich to Liverpool St line appear to have the short swing link type BT10 bogie. It’s not that the links are any shorter than on the long swing link bogie, but that the sideways motion is restricted by – and get this – wire rope attached to the bogie frame!
Maybe that explains why the riding is a little inferior to the GW HST sets. (or it could be the track). Anyway, they’re a step forward from the mark 2’s, especially during hot weather when the mark 2 air con was inclined to pack up.
Maybe that explains why the riding is a little inferior to the GW HST sets. (or it could be the track). Anyway, they’re a step forward from the mark 2’s, especially during hot weather when the mark 2 air con was inclined to pack up.