Copenhagen Fields & TFW’s workshop

This forum is for the discussion of railway modelling of the LNER and its constituent companies.

Moderators: 52D, Tom F, Rlangham, Atlantic 3279, Blink Bonny, Saint Johnstoun, richard

Tim Watson
GER D14 4-4-0 'Claud Hamilton'
Posts: 358
Joined: Mon Oct 24, 2016 11:37 am

Re: Copenhagen Fields & TFW’s workshop

Post by Tim Watson »

john coffin wrote: Tue Dec 10, 2024 4:05 pm It is also the "lamp iron" at the top does not seem quite right either.
I am quite happy to be wrong, but if we do not strive for your standards, then why are we bothering?

Paul
The original lamp iron hole was off centre and above the handrail stanchion hole. However, It has now been drifted centrally and will be incorporated into the top handrail stanchion as one more robust unit: its position will be adjustable with that assembly. It would not have survived for long in the original position.

Tim
john coffin
LNER V2 2-6-2 'Green Arrow'
Posts: 1105
Joined: Mon Sep 19, 2011 12:24 am

Re: Copenhagen Fields & TFW’s workshop

Post by john coffin »

I knew you would have a cunning plan Tim!
Tim Watson
GER D14 4-4-0 'Claud Hamilton'
Posts: 358
Joined: Mon Oct 24, 2016 11:37 am

Re: Copenhagen Fields & TFW’s workshop

Post by Tim Watson »

Mass production of under-frames in progress. Set up on milling machine. 
Image

The cut outs are obviously for the bogie wheels. 
Image

Interesting end next. 

Tim
Tim Watson
GER D14 4-4-0 'Claud Hamilton'
Posts: 358
Joined: Mon Oct 24, 2016 11:37 am

Re: Copenhagen Fields & TFW’s workshop

Post by Tim Watson »

And now for the start of the fun and games. The main 1mm-thick brass chassis spars for the Coronation set have been made and can be seen located in the 3DP chassis; designed and printed by Mike Trice. The articulated joint is an overlapping design, with the extra layer beneath the main spar. 
Image
The (currently) simple articulated joint was made by making the additional tongue from 1mm brass, drilled as a strip and then cut off, as required. 
Image
These short tongues were then soldered to the main spar using the pivot hole for location - the separate components can be seen at the top of the image with the soldering in progress towards the bottom. The drill shank was pushed into a mica block and the underside of the tongue on the spar notched to make it easier to cut through and remove when finished soldering. This also reduced solder flow in that region and the same tongue coated with a black felt tip acted as an anti-flux: of course drill shanks won’t take soft solder, either. The plastic bottle with a needle tube is for phosphoric acid flux. 
Image
This close up should make clear the inherent flexibility of the simple joint, but that is probably not how it will stay…
Image

Tim
Tim Watson
GER D14 4-4-0 'Claud Hamilton'
Posts: 358
Joined: Mon Oct 24, 2016 11:37 am

Re: Copenhagen Fields & TFW’s workshop

Post by Tim Watson »

Just a random smiley little picture.
Image
Happy Christmas & a prosperous New Year to all.

Tim
Tim Watson
GER D14 4-4-0 'Claud Hamilton'
Posts: 358
Joined: Mon Oct 24, 2016 11:37 am

Re: Copenhagen Fields & TFW’s workshop

Post by Tim Watson »

As many of you will be aware, Hornby have produced a rather good Coronation set in 4mm scale with a streamlined canvas fairing cleverly modelled. I was kindly given images of these by Tony Wright & Jesse Sim to work out the mechanism, actually confirmed by seeing one in the flesh at the MRC. I thought this clever idea could be made to work in 2mm scale.
Image

My previous streamlined Silver Jubilee set had thin rubber fairings (dental dam) fixed at one end and tucked into the neighbouring coach: unfortunately these have perished over the years. The Coronation is different because the canvas fairings were painted to match the body colour and so a solid structure would represent this rather better - as per Hornby.
The coach bodies therefore need to separate when traversing a curve: this is achieved by a mechanism based on two curved slots engaged by pins at each end of the bogie with the articulated pivot slotted to allow extension. As the bogie enters a curve, the pins move into the opposed curved sections and so the carriage bodies move apart on the articulation slot.
Image

Image
I realised that fabricating such an extending mechanism would require fairly accurate cutting out; some simple drilling jigs were therefore made to ensure commonality between the chassis and the bogie. As a reference, the centre line of the chassis spar was scribed between the articulation point and the conventional bogie pivot. The articulation end was then stabilised on a drill shank in a block of Tufnol. This also located the steel drilling jig and its centre line notch aligned with the scribed line, finally being held with a drop of cyanoacrylate adhesive at the free end. The first centre hole was drilled, then a pin placed in the hole to further stabilise the jig whilst the other two holes were drilled either side, being at the extremities of the prospective arc. (The nearer set of holes in the steel jig are for extra heavy-weight 10’ bogies.)
07731ca9-f168-457e-8ee7-72f77c2bb5ab.jpeImage
The two arcs between the holes were cut out with a piercing saw and filed to allow a 1mm diameter rod to freely pass through the shape. At this stage the articulation pivot hole had not been elongated to allow lengthening.
Image
The same steel jig was then located within the underside of the bogie and the drive pin holes drilled at each end, directly above the axle in the midline.
Image
Some provisional pins were made from 10 & 12BA bolts for the main bogie pivot shaft and the two drive pins respectively. The streamlined fairing was made from a 4mm thick sheet of very hard grade Tufnol, with two pegs milled into the bottom, a centre hole drilled and two 14BA studs drilled, tapped and Araldited into the two pegs.
URL=https://hosting.photobucket.com/b0831d0 ... fit=bounds]Image[/URL]
The two holes for the fairing, either side of the bogie pivot post, were drilled using a steel and brass jig for drilling the stud holes. This was held in place (temporarily) with a 10BA nut and bolt whilst the 0.8mm holes were drilled (subsequently reamed to 1mm clearance).
Image
The same jig was used to drill the Tufnol fairing it having already been drilled 1.7mm clearance for the central 10BA bolt, using this hole to locate the jig. The assembly was clamped in the vice, simultaneously holding the fairing for drilling as can be seen in the image below.19007a73-2e73-4154-b4c3-1f6713082ff2.jpe
Image
The bare bones of the articulated carriages worked together broadly as expected when placed on an 18” radius test track; they were also acceptable with the 3DP under frames and fairing in situ.
Image

Image
In order to work smoothly the fairing needs to be bevelled on its outer corners and the inverse on the carriage bodies. These were filed and smoothed accordingly.
3307a42c-aaf4-4767-a782-f6b85a35dc22.jpeImage
The mechanism at its most extreme can be seen with the temporary bodies assembled on the 18” test track. It looks as if the fairing is herniating sideways like a slipped disc, but it actually stays in position on the bogie and is lost within the carriage body.
92338194-57a2-487e-9682-5fd61b6773d5.jpeImage
It runs well enough on the test track (interesting beaver tail…), but the acid test will be trying it out on the layout.
Image
022a29dd-e235-44c5-a4fa-3c79567ff892.jpe
https://youtu.be/Uji98WRoaiI?feature=shared
The carriages are not a new streamlined LNER / GNER suburban service but the core for the etched sides for the Coronation set itself. Our curves are much more generous on CF than train sets so we might get quite a good prototypically subtle result, especially as our visible tracks are virtually straight.
Image
Once I am content that the prototype is working as expected, then the other three pairs will be made. The inter articulated-pair ends will also be fully streamlined, probably much as Hornby have with their sets. It has certainly made me stretch the little grey cells getting this far.

If anyone has made it to the end of this post: well done! You deserve a New Year celebration drink.

All the best for 2025

Tim
Jim de Griz
H&BR Q10 0-8-0
Posts: 182
Joined: Thu Apr 01, 2021 8:47 pm

Re: Copenhagen Fields & TFW’s workshop

Post by Jim de Griz »

I was wondering about the choice of motive power :)

Looking very good, I'm going to be very interested in seeing the result.

Jim de Griz
Tim Watson
GER D14 4-4-0 'Claud Hamilton'
Posts: 358
Joined: Mon Oct 24, 2016 11:37 am

Re: Copenhagen Fields & TFW’s workshop

Post by Tim Watson »

Now the next fun and games has started. Owing quite a lot to an Azuma, apart from the obvious shape. 
Image
Watch this space, or soon to be lack of…

Tim
Tim Watson
GER D14 4-4-0 'Claud Hamilton'
Posts: 358
Joined: Mon Oct 24, 2016 11:37 am

Re: Copenhagen Fields & TFW’s workshop

Post by Tim Watson »


My Delphic comment about the Azuma, relates to the close kinetic coupling arrangement used by Kato on their excellent N gauge model. I thought this could work for the ends of the Coronation twins. 
Image
The design is a masterpiece of miniature plastic engineering.
Image
As per the Hornby system, the ends are extended with half of the canvas fairing. 
Image
The prototype was cut out from 3.4mm thick Tufnol. 
Image
The visual effect is good on the straight, but obviously suffers a bit when entering a sharp curve; not a problem on the front of CF.


The testing on the layout was OK, but it was all a bit wibbly wobbly as nothing was definitively fixed in place. I think it will be OK,, once everything is positively located and fettled. The twin set ends will be 3DP extensions, being made by Justin Colson who is also making some rather fine tables and seats for the first class carriages.
Image
The table shape is very characteristic and will show up through the windows. 
Image
 
As ever a team effort on CF. 
 
Tim
 
Tim Watson
GER D14 4-4-0 'Claud Hamilton'
Posts: 358
Joined: Mon Oct 24, 2016 11:37 am

Re: Copenhagen Fields & TFW’s workshop

Post by Tim Watson »

Tim Watson wrote: Sun Jan 05, 2025 11:51 pm
My Delphic comment about the Azuma, relates to the close kinetic coupling arrangement used by Kato on their excellent N gauge model. I thought this could work for the ends of the Coronation twins. 
Image
The design is a masterpiece of miniature plastic engineering.
Image
As per the Hornby system, the ends are extended with half of the canvas fairing. 
Image
The prototype was cut out from 3.4mm thick Tufnol. 
Image
The visual effect is good on the straight, but obviously suffers a bit when entering a sharp curve; not a problem on the front of CF.
https://youtu.be/CNBZ3Urhcmw?feature=shared

The testing on the layout was OK, but it was all a bit wibbly wobbly as nothing was definitively fixed in place. I think it will be OK,, once everything is positively located and fettled. The twin set ends will be 3DP extensions, being made by Justin Colson who is also making some rather fine tables and seats for the first class carriages.
Image
The table shape is very characteristic and will show up through the windows. 
Image
 
As ever a team effort on CF. 
 
Tim
 
Post Reply